An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer

Artem Katasonov, Toni Lastusilta, Timo Korvola, Leila Saari, Dan Bendas, Roberto Camp, Wael M. Mohammed, Angelica Lee Nieto

    Research output: Chapter in Book/Report/Conference proceedingConference article in proceedingsScientificpeer-review

    2 Citations (Scopus)

    Abstract

    Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.
    Original languageEnglish
    Title of host publication2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)
    Subtitle of host publicationEngineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings
    EditorsJoao Pedro Mendonca, Ricardo Jardim-Goncalves, Joao Martins, Alain Zarli, Maria Marques, Marc Pallot
    PublisherIEEE Institute of Electrical and Electronic Engineers
    Pages1123-1130
    Number of pages8
    ISBN (Electronic)9781538607749
    ISBN (Print)978-1-5386-0774-9
    DOIs
    Publication statusPublished - 2 Feb 2018
    MoE publication typeA4 Article in a conference publication
    Event23rd International Conference On Engineering, Technlogy and Innovation, ICE/ITMC - Madeira, Portugal
    Duration: 27 Jun 201729 Jun 2017

    Conference

    Conference23rd International Conference On Engineering, Technlogy and Innovation, ICE/ITMC
    Abbreviated titleICE/ITMC 2017
    CountryPortugal
    CityMadeira
    Period27/06/1729/06/17

    Fingerprint

    Lubrication
    Scheduling
    Hydraulics
    Visibility
    Industry
    Planning
    Oils

    Keywords

    • supply network
    • production scheduling
    • optimization
    • enterprise collaboration
    • cloud-supported manufacturing
    • just-in-time manufacturing
    • on time delivery
    • information exchange
    • small and medium size enterprise (SME)

    Cite this

    Katasonov, A., Lastusilta, T., Korvola, T., Saari, L., Bendas, D., Camp, R., ... Lee Nieto, A. (2018). An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. In J. P. Mendonca, R. Jardim-Goncalves, J. Martins, A. Zarli, M. Marques, & M. Pallot (Eds.), 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings (pp. 1123-1130). IEEE Institute of Electrical and Electronic Engineers . https://doi.org/10.1109/ICE.2017.8280007
    Katasonov, Artem ; Lastusilta, Toni ; Korvola, Timo ; Saari, Leila ; Bendas, Dan ; Camp, Roberto ; Mohammed, Wael M. ; Lee Nieto, Angelica. / An Approach to Production Scheduling Optimization : A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings. editor / Joao Pedro Mendonca ; Ricardo Jardim-Goncalves ; Joao Martins ; Alain Zarli ; Maria Marques ; Marc Pallot. IEEE Institute of Electrical and Electronic Engineers , 2018. pp. 1123-1130
    @inproceedings{a5232cab844b4bf9a294182b006a721d,
    title = "An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer",
    abstract = "Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.",
    keywords = "supply network, production scheduling, optimization, enterprise collaboration, cloud-supported manufacturing, just-in-time manufacturing, on time delivery, information exchange, small and medium size enterprise (SME)",
    author = "Artem Katasonov and Toni Lastusilta and Timo Korvola and Leila Saari and Dan Bendas and Roberto Camp and Mohammed, {Wael M.} and {Lee Nieto}, Angelica",
    year = "2018",
    month = "2",
    day = "2",
    doi = "10.1109/ICE.2017.8280007",
    language = "English",
    isbn = "978-1-5386-0774-9",
    pages = "1123--1130",
    editor = "Mendonca, {Joao Pedro} and Ricardo Jardim-Goncalves and Joao Martins and Alain Zarli and Maria Marques and Marc Pallot",
    booktitle = "2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)",
    publisher = "IEEE Institute of Electrical and Electronic Engineers",
    address = "United States",

    }

    Katasonov, A, Lastusilta, T, Korvola, T, Saari, L, Bendas, D, Camp, R, Mohammed, WM & Lee Nieto, A 2018, An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. in JP Mendonca, R Jardim-Goncalves, J Martins, A Zarli, M Marques & M Pallot (eds), 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings. IEEE Institute of Electrical and Electronic Engineers , pp. 1123-1130, 23rd International Conference On Engineering, Technlogy and Innovation, ICE/ITMC , Madeira, Portugal, 27/06/17. https://doi.org/10.1109/ICE.2017.8280007

    An Approach to Production Scheduling Optimization : A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. / Katasonov, Artem; Lastusilta, Toni; Korvola, Timo; Saari, Leila; Bendas, Dan; Camp, Roberto; Mohammed, Wael M.; Lee Nieto, Angelica.

    2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings. ed. / Joao Pedro Mendonca; Ricardo Jardim-Goncalves; Joao Martins; Alain Zarli; Maria Marques; Marc Pallot. IEEE Institute of Electrical and Electronic Engineers , 2018. p. 1123-1130.

    Research output: Chapter in Book/Report/Conference proceedingConference article in proceedingsScientificpeer-review

    TY - GEN

    T1 - An Approach to Production Scheduling Optimization

    T2 - A Case of an Oil Lubrication and Hydraulic Systems Manufacturer

    AU - Katasonov, Artem

    AU - Lastusilta, Toni

    AU - Korvola, Timo

    AU - Saari, Leila

    AU - Bendas, Dan

    AU - Camp, Roberto

    AU - Mohammed, Wael M.

    AU - Lee Nieto, Angelica

    PY - 2018/2/2

    Y1 - 2018/2/2

    N2 - Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.

    AB - Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.

    KW - supply network

    KW - production scheduling

    KW - optimization

    KW - enterprise collaboration

    KW - cloud-supported manufacturing

    KW - just-in-time manufacturing

    KW - on time delivery

    KW - information exchange

    KW - small and medium size enterprise (SME)

    UR - http://www.scopus.com/inward/record.url?scp=85047524893&partnerID=8YFLogxK

    U2 - 10.1109/ICE.2017.8280007

    DO - 10.1109/ICE.2017.8280007

    M3 - Conference article in proceedings

    SN - 978-1-5386-0774-9

    SP - 1123

    EP - 1130

    BT - 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)

    A2 - Mendonca, Joao Pedro

    A2 - Jardim-Goncalves, Ricardo

    A2 - Martins, Joao

    A2 - Zarli, Alain

    A2 - Marques, Maria

    A2 - Pallot, Marc

    PB - IEEE Institute of Electrical and Electronic Engineers

    ER -

    Katasonov A, Lastusilta T, Korvola T, Saari L, Bendas D, Camp R et al. An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. In Mendonca JP, Jardim-Goncalves R, Martins J, Zarli A, Marques M, Pallot M, editors, 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings. IEEE Institute of Electrical and Electronic Engineers . 2018. p. 1123-1130 https://doi.org/10.1109/ICE.2017.8280007