An Approach to Production Scheduling Optimization

A Case of an Oil Lubrication and Hydraulic Systems Manufacturer

Artem Katasonov, Toni Lastusilta, Timo Korvola, Leila Saari, Dan Bendas, Roberto Camp, Wael M. Mohammed, Angelica Lee Nieto

Research output: Chapter in Book/Report/Conference proceedingConference article in proceedingsScientificpeer-review

2 Citations (Scopus)

Abstract

Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.
Original languageEnglish
Title of host publication2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)
Subtitle of host publicationEngineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings
EditorsJoao Pedro Mendonca, Ricardo Jardim-Goncalves, Joao Martins, Alain Zarli, Maria Marques, Marc Pallot
PublisherInstitute of Electrical and Electronic Engineers IEEE
Pages1123-1130
Number of pages8
ISBN (Electronic)9781538607749
ISBN (Print)978-1-5386-0774-9
DOIs
Publication statusPublished - 2 Feb 2018
MoE publication typeA4 Article in a conference publication
Event23rd International Conference On Engineering, Technlogy and Innovation, ICE/ITMC - Madeira, Portugal
Duration: 27 Jun 201729 Jun 2017

Conference

Conference23rd International Conference On Engineering, Technlogy and Innovation, ICE/ITMC
Abbreviated titleICE/ITMC 2017
CountryPortugal
CityMadeira
Period27/06/1729/06/17

Fingerprint

Lubrication
Scheduling
Hydraulics
Visibility
Industry
Planning
Oils

Keywords

  • supply network
  • production scheduling
  • optimization
  • enterprise collaboration
  • cloud-supported manufacturing
  • just-in-time manufacturing
  • on time delivery
  • information exchange
  • small and medium size enterprise (SME)

Cite this

Katasonov, A., Lastusilta, T., Korvola, T., Saari, L., Bendas, D., Camp, R., ... Lee Nieto, A. (2018). An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. In J. P. Mendonca, R. Jardim-Goncalves, J. Martins, A. Zarli, M. Marques, & M. Pallot (Eds.), 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings (pp. 1123-1130). Institute of Electrical and Electronic Engineers IEEE. https://doi.org/10.1109/ICE.2017.8280007
Katasonov, Artem ; Lastusilta, Toni ; Korvola, Timo ; Saari, Leila ; Bendas, Dan ; Camp, Roberto ; Mohammed, Wael M. ; Lee Nieto, Angelica. / An Approach to Production Scheduling Optimization : A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings. editor / Joao Pedro Mendonca ; Ricardo Jardim-Goncalves ; Joao Martins ; Alain Zarli ; Maria Marques ; Marc Pallot. Institute of Electrical and Electronic Engineers IEEE, 2018. pp. 1123-1130
@inproceedings{a5232cab844b4bf9a294182b006a721d,
title = "An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer",
abstract = "Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.",
keywords = "supply network, production scheduling, optimization, enterprise collaboration, cloud-supported manufacturing, just-in-time manufacturing, on time delivery, information exchange, small and medium size enterprise (SME)",
author = "Artem Katasonov and Toni Lastusilta and Timo Korvola and Leila Saari and Dan Bendas and Roberto Camp and Mohammed, {Wael M.} and {Lee Nieto}, Angelica",
year = "2018",
month = "2",
day = "2",
doi = "10.1109/ICE.2017.8280007",
language = "English",
isbn = "978-1-5386-0774-9",
pages = "1123--1130",
editor = "Mendonca, {Joao Pedro} and Ricardo Jardim-Goncalves and Joao Martins and Alain Zarli and Maria Marques and Marc Pallot",
booktitle = "2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)",
publisher = "Institute of Electrical and Electronic Engineers IEEE",
address = "United States",

}

Katasonov, A, Lastusilta, T, Korvola, T, Saari, L, Bendas, D, Camp, R, Mohammed, WM & Lee Nieto, A 2018, An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. in JP Mendonca, R Jardim-Goncalves, J Martins, A Zarli, M Marques & M Pallot (eds), 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings. Institute of Electrical and Electronic Engineers IEEE, pp. 1123-1130, 23rd International Conference On Engineering, Technlogy and Innovation, ICE/ITMC , Madeira, Portugal, 27/06/17. https://doi.org/10.1109/ICE.2017.8280007

An Approach to Production Scheduling Optimization : A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. / Katasonov, Artem; Lastusilta, Toni; Korvola, Timo; Saari, Leila; Bendas, Dan; Camp, Roberto; Mohammed, Wael M.; Lee Nieto, Angelica.

2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings. ed. / Joao Pedro Mendonca; Ricardo Jardim-Goncalves; Joao Martins; Alain Zarli; Maria Marques; Marc Pallot. Institute of Electrical and Electronic Engineers IEEE, 2018. p. 1123-1130.

Research output: Chapter in Book/Report/Conference proceedingConference article in proceedingsScientificpeer-review

TY - GEN

T1 - An Approach to Production Scheduling Optimization

T2 - A Case of an Oil Lubrication and Hydraulic Systems Manufacturer

AU - Katasonov, Artem

AU - Lastusilta, Toni

AU - Korvola, Timo

AU - Saari, Leila

AU - Bendas, Dan

AU - Camp, Roberto

AU - Mohammed, Wael M.

AU - Lee Nieto, Angelica

PY - 2018/2/2

Y1 - 2018/2/2

N2 - Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.

AB - Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.

KW - supply network

KW - production scheduling

KW - optimization

KW - enterprise collaboration

KW - cloud-supported manufacturing

KW - just-in-time manufacturing

KW - on time delivery

KW - information exchange

KW - small and medium size enterprise (SME)

UR - http://www.scopus.com/inward/record.url?scp=85047524893&partnerID=8YFLogxK

U2 - 10.1109/ICE.2017.8280007

DO - 10.1109/ICE.2017.8280007

M3 - Conference article in proceedings

SN - 978-1-5386-0774-9

SP - 1123

EP - 1130

BT - 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)

A2 - Mendonca, Joao Pedro

A2 - Jardim-Goncalves, Ricardo

A2 - Martins, Joao

A2 - Zarli, Alain

A2 - Marques, Maria

A2 - Pallot, Marc

PB - Institute of Electrical and Electronic Engineers IEEE

ER -

Katasonov A, Lastusilta T, Korvola T, Saari L, Bendas D, Camp R et al. An Approach to Production Scheduling Optimization: A Case of an Oil Lubrication and Hydraulic Systems Manufacturer. In Mendonca JP, Jardim-Goncalves R, Martins J, Zarli A, Marques M, Pallot M, editors, 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC): Engineering, Technology and Innovation Management Beyond 2020: New Challenges, New Approaches, ICE/ITMC 2017 - Proceedings. Institute of Electrical and Electronic Engineers IEEE. 2018. p. 1123-1130 https://doi.org/10.1109/ICE.2017.8280007