Automatic testing in the integration phase of mobile work machine (TINAT) - MASIT31

P. Multanen, M. Hyvönen, A. Ellman, Seppo Rantala

Research output: Chapter in Book/Report/Conference proceedingChapter or book articleProfessional

Abstract

The performance and reliability of mobile work machines are significantly affected by control systems of machines and their characteristics. Currently the testing of control systems and verification of their properties is often carried out just in the integration phase of controls and mechanical structure of machine. This is very time consuming, requires a lot of test personnel and is not extensive enough. In TINAT project a test concept will be developed for the testing of entire control systems of work machines without real the mechanical structures of the machines by utilizing modelling and real-time hardware-in-the-loop simulation. The simulator system enables automatic generation of test scenarios and automatic analysis and reporting of test results.
Original languageEnglish
Title of host publication MASI Programme 2005-2009. Yearbook 2008
Place of PublicationHelsinki
PublisherTEKES
Pages245-249
ISBN (Print)978-952-457-406-8
Publication statusPublished - 2008
MoE publication typeD2 Article in professional manuals or guides or professional information systems or text book material

Publication series

NameTekes Review
PublisherTekes
Number228/2008

Fingerprint

Automatic testing
Control systems
Testing
Simulators
Personnel
Hardware

Cite this

Multanen, P., Hyvönen, M., Ellman, A., & Rantala, S. (2008). Automatic testing in the integration phase of mobile work machine (TINAT) - MASIT31. In MASI Programme 2005-2009. Yearbook 2008 (pp. 245-249). Helsinki: TEKES. Tekesin katsaus, No. 228/2008
Multanen, P. ; Hyvönen, M. ; Ellman, A. ; Rantala, Seppo. / Automatic testing in the integration phase of mobile work machine (TINAT) - MASIT31. MASI Programme 2005-2009. Yearbook 2008. Helsinki : TEKES, 2008. pp. 245-249 (Tekesin katsaus; No. 228/2008).
@inbook{93676937850a401bb12574b944547417,
title = "Automatic testing in the integration phase of mobile work machine (TINAT) - MASIT31",
abstract = "The performance and reliability of mobile work machines are significantly affected by control systems of machines and their characteristics. Currently the testing of control systems and verification of their properties is often carried out just in the integration phase of controls and mechanical structure of machine. This is very time consuming, requires a lot of test personnel and is not extensive enough. In TINAT project a test concept will be developed for the testing of entire control systems of work machines without real the mechanical structures of the machines by utilizing modelling and real-time hardware-in-the-loop simulation. The simulator system enables automatic generation of test scenarios and automatic analysis and reporting of test results.",
author = "P. Multanen and M. Hyv{\"o}nen and A. Ellman and Seppo Rantala",
year = "2008",
language = "English",
isbn = "978-952-457-406-8",
series = "Tekes Review",
publisher = "TEKES",
number = "228/2008",
pages = "245--249",
booktitle = "MASI Programme 2005-2009. Yearbook 2008",
address = "Finland",

}

Multanen, P, Hyvönen, M, Ellman, A & Rantala, S 2008, Automatic testing in the integration phase of mobile work machine (TINAT) - MASIT31. in MASI Programme 2005-2009. Yearbook 2008. TEKES, Helsinki, Tekesin katsaus, no. 228/2008, pp. 245-249.

Automatic testing in the integration phase of mobile work machine (TINAT) - MASIT31. / Multanen, P.; Hyvönen, M.; Ellman, A.; Rantala, Seppo.

MASI Programme 2005-2009. Yearbook 2008. Helsinki : TEKES, 2008. p. 245-249 (Tekesin katsaus; No. 228/2008).

Research output: Chapter in Book/Report/Conference proceedingChapter or book articleProfessional

TY - CHAP

T1 - Automatic testing in the integration phase of mobile work machine (TINAT) - MASIT31

AU - Multanen, P.

AU - Hyvönen, M.

AU - Ellman, A.

AU - Rantala, Seppo

PY - 2008

Y1 - 2008

N2 - The performance and reliability of mobile work machines are significantly affected by control systems of machines and their characteristics. Currently the testing of control systems and verification of their properties is often carried out just in the integration phase of controls and mechanical structure of machine. This is very time consuming, requires a lot of test personnel and is not extensive enough. In TINAT project a test concept will be developed for the testing of entire control systems of work machines without real the mechanical structures of the machines by utilizing modelling and real-time hardware-in-the-loop simulation. The simulator system enables automatic generation of test scenarios and automatic analysis and reporting of test results.

AB - The performance and reliability of mobile work machines are significantly affected by control systems of machines and their characteristics. Currently the testing of control systems and verification of their properties is often carried out just in the integration phase of controls and mechanical structure of machine. This is very time consuming, requires a lot of test personnel and is not extensive enough. In TINAT project a test concept will be developed for the testing of entire control systems of work machines without real the mechanical structures of the machines by utilizing modelling and real-time hardware-in-the-loop simulation. The simulator system enables automatic generation of test scenarios and automatic analysis and reporting of test results.

M3 - Chapter or book article

SN - 978-952-457-406-8

T3 - Tekes Review

SP - 245

EP - 249

BT - MASI Programme 2005-2009. Yearbook 2008

PB - TEKES

CY - Helsinki

ER -

Multanen P, Hyvönen M, Ellman A, Rantala S. Automatic testing in the integration phase of mobile work machine (TINAT) - MASIT31. In MASI Programme 2005-2009. Yearbook 2008. Helsinki: TEKES. 2008. p. 245-249. (Tekesin katsaus; No. 228/2008).