Abstract
Traditionally manufacturing industries are over designing
and engineering products before the commercialization.
This study indicates four stages for accelerating idea to
market time in manufacturing industries, by combining
best practices from the lean startup methodology and
software industries case study experiences.
Original language | English |
---|---|
Publication status | Published - 2017 |
MoE publication type | Not Eligible |
Event | 28th Annual Production and Operations Management Society Conference, POMS 2017. Global Operations: Social Good, Emerging Horizons and Technology - Seattle, United States Duration: 5 May 2017 → 8 May 2017 |
Conference
Conference | 28th Annual Production and Operations Management Society Conference, POMS 2017. Global Operations: Social Good, Emerging Horizons and Technology |
---|---|
Abbreviated title | POMS 2017 |
Country/Territory | United States |
City | Seattle |
Period | 5/05/17 → 8/05/17 |
Keywords
- engineering
- innovation
- time to market
- acceleration