Best practices: PARADE. Best practices for Pre-demolition Audits ensuring high quality RAw materials

Petr Hradil, Margareta Wahlström, Jef Bergmans, Liesbet van Cauwenberghe, Alena Sičáková, Zuzana Struková, Jozef Junák, Jiabin Li

    Research output: Book/ReportReport

    321 Downloads (Pure)

    Abstract

    This report presents selected examples of the best practices in demolition and waste management work covering the whole value chain from inventories to the new products from the recovered materials. The examples of solutions for reuse or recycling of construction and demolition waste can provide overview of the possible options for management of materials and components arising from the demolition or renovation works. This is especially important in the pre-demolition auditing process when the recommendations are formulated by the auditor and preliminary decisions are made by the owner of the material. The document also includes examples of policy instruments.

    This activity has received funding from EIT RawMaterials, initiated and funded by the European Institute of Innovation and Technology (EIT), a body of the European Union, under the Horizon 2020, the EU Framework Programme for Research and Innovation.
    Original languageEnglish
    PublisherEIT RawMaterials
    Number of pages34
    Publication statusPublished - 31 Dec 2019
    MoE publication typeD4 Published development or research report or study

    Fingerprint

    Dive into the research topics of 'Best practices: PARADE. Best practices for Pre-demolition Audits ensuring high quality RAw materials'. Together they form a unique fingerprint.

    Cite this