Comparing the process from risks to SIL/PL assignment: A round robin test

Timo Malm

    Research output: Contribution to conferenceConference articleScientific

    Abstract

    The risk assessment for estimating functional safety requirements was researched and the results are presented at the paper. A round robin test was conducted to compare and check how well the methods matched each other. The assessors estimated the parameters of the risks and assigned the required SIL (Safety Integrity Level according to IEC 62061) and PL (Performance Level according to ISO 13849-1). The study shows that in most cases the results correspond to each other, though there are some exceptions related to low risks.
    Original languageEnglish
    Number of pages24
    Publication statusPublished - 2016
    EventFunctional Safety for Non-Road Vehicles and Mobile Machinery - Berlin, Germany
    Duration: 21 Mar 201624 Mar 2016

    Conference

    ConferenceFunctional Safety for Non-Road Vehicles and Mobile Machinery
    CountryGermany
    CityBerlin
    Period21/03/1624/03/16

    Fingerprint

    Risk assessment

    Keywords

    • functional safety
    • risk assessment
    • safety requirements
    • machinery

    Cite this

    Malm, T. (2016). Comparing the process from risks to SIL/PL assignment: A round robin test. Paper presented at Functional Safety for Non-Road Vehicles and Mobile Machinery, Berlin, Germany.
    Malm, Timo. / Comparing the process from risks to SIL/PL assignment : A round robin test. Paper presented at Functional Safety for Non-Road Vehicles and Mobile Machinery, Berlin, Germany.24 p.
    @conference{f2ff5279e31849ba8886f59781595083,
    title = "Comparing the process from risks to SIL/PL assignment: A round robin test",
    abstract = "The risk assessment for estimating functional safety requirements was researched and the results are presented at the paper. A round robin test was conducted to compare and check how well the methods matched each other. The assessors estimated the parameters of the risks and assigned the required SIL (Safety Integrity Level according to IEC 62061) and PL (Performance Level according to ISO 13849-1). The study shows that in most cases the results correspond to each other, though there are some exceptions related to low risks.",
    keywords = "functional safety, risk assessment, safety requirements, machinery",
    author = "Timo Malm",
    note = "Project code: 101451 ; Functional Safety for Non-Road Vehicles and Mobile Machinery ; Conference date: 21-03-2016 Through 24-03-2016",
    year = "2016",
    language = "English",

    }

    Malm, T 2016, 'Comparing the process from risks to SIL/PL assignment: A round robin test', Paper presented at Functional Safety for Non-Road Vehicles and Mobile Machinery, Berlin, Germany, 21/03/16 - 24/03/16.

    Comparing the process from risks to SIL/PL assignment : A round robin test. / Malm, Timo.

    2016. Paper presented at Functional Safety for Non-Road Vehicles and Mobile Machinery, Berlin, Germany.

    Research output: Contribution to conferenceConference articleScientific

    TY - CONF

    T1 - Comparing the process from risks to SIL/PL assignment

    T2 - A round robin test

    AU - Malm, Timo

    N1 - Project code: 101451

    PY - 2016

    Y1 - 2016

    N2 - The risk assessment for estimating functional safety requirements was researched and the results are presented at the paper. A round robin test was conducted to compare and check how well the methods matched each other. The assessors estimated the parameters of the risks and assigned the required SIL (Safety Integrity Level according to IEC 62061) and PL (Performance Level according to ISO 13849-1). The study shows that in most cases the results correspond to each other, though there are some exceptions related to low risks.

    AB - The risk assessment for estimating functional safety requirements was researched and the results are presented at the paper. A round robin test was conducted to compare and check how well the methods matched each other. The assessors estimated the parameters of the risks and assigned the required SIL (Safety Integrity Level according to IEC 62061) and PL (Performance Level according to ISO 13849-1). The study shows that in most cases the results correspond to each other, though there are some exceptions related to low risks.

    KW - functional safety

    KW - risk assessment

    KW - safety requirements

    KW - machinery

    M3 - Conference article

    ER -

    Malm T. Comparing the process from risks to SIL/PL assignment: A round robin test. 2016. Paper presented at Functional Safety for Non-Road Vehicles and Mobile Machinery, Berlin, Germany.