Skip to main navigation
Skip to search
Skip to main content
Sort by
INIS
ground water
100%
disturbances
100%
grouting
53%
rocks
46%
leakage
38%
construction
30%
water
30%
tables
23%
drawdown
23%
underground facilities
23%
surfaces
15%
operation
15%
zones
15%
fractures
15%
installation
15%
cements
15%
excavation
15%
solutions
7%
performance
7%
engineering
7%
buffers
7%
balances
7%
design
7%
migration
7%
capacity
7%
specifications
7%
connections
7%
mixing
7%
meters
7%
verification
7%
freezing
7%
pumping
7%
linings
7%
best available technology
7%
backfilling
7%
Engineering
Groundwater Inflow
100%
Groundwater Table
100%
Inflow Rate
66%
Operation Phase
33%
Technical Solution
33%
Construction Phase
33%
Ground Surface
33%
Buffering Capacity
33%
Backfilling
33%
Rock Engineering
33%
Keyphrases
Groundwater Inflow
100%
Disposal Tunnel
14%
Backfilling
14%
Post-closure
14%
Grouting Works
14%
Surface Connection
14%
Earth and Planetary Sciences
Grouting
100%
Water Type
14%
Engineering Work
14%
Bedrock
14%