Dynamic modelling of the helium-cooled DEMO fusion power plant with an auxiliary boiler in Apros

Márton Szógrádi* (Corresponding Author), Sixten Norrman, Evaldas Bubelis

*Corresponding author for this work

Research output: Contribution to journalArticleScientificpeer-review

18 Citations (Scopus)

Abstract

The Demonstration Fusion Power Plant (DEMO) project aims to construct and successfully operate an industrial size tokamak fusion power plant generating electricity and supplying it to the grid. In order to succeed in this task, several challenges in the current fusion technologies have to be overcome. One key challenge is related to the pulsed operation of the machine and adoption of conventional power conversion systems, which are usually designed for their continuous operation. The DEMO balance-of-plant systems have to be designed to manage a periodical drop in fusion heat production during the dwell period. A configuration utilizing an Auxiliary Boiler (AUXB) between the helium-cooled Primary Heat Transfer System (PHTS) and the Power Conversion System (PCS) have been studied over the course of several years within the EUROfusion Balance of Plant (BoP) work package. In such arrangement the AUXB provides necessary power to maintain ∼50 % power generation conditions in the PCS during dwell time. KIT developed a realistic PCS scheme and performed steady-state balance analysis for pulse and dwell operation of DEMO with the simulation tool Ebsilon®. To complement the static analyses VTT has made a model of the same configuration with the Apros® system code. Dynamic analyses have been performed to assess plant performance during power cycles consisting of transitions from pulse to dwell and back to pulse operation. The goal of present study was to verify that the developed balance-of-plant concept is feasible, to establish and optimize a plausible control strategy minimizing various stresses on the components, i.e. enhancing reliability of DEMO operation, moreover, providing input for further improvements. It was concluded that although in certain aspects (e.g. steam qualities and deaerator pressure) the model showed acceptable behavior, on the other hand considering turbine pressures and feedwater temperatures the AUXB power was not sufficient to maintain the desirable conditions during dwell as postulated by Ebsilon Heat Balance.
Original languageEnglish
Article number111970
JournalFusion Engineering and Design
Volume160
DOIs
Publication statusPublished - Nov 2020
MoE publication typeA1 Journal article-refereed

Keywords

  • Apros®
  • Auxiliary boiler
  • Balance of plant
  • DEMO
  • Direct coupling
  • Helium cooled pebble bed breeding blanket

Fingerprint

Dive into the research topics of 'Dynamic modelling of the helium-cooled DEMO fusion power plant with an auxiliary boiler in Apros'. Together they form a unique fingerprint.

Cite this