Skip to main navigation Skip to search Skip to main content

Early stage energy refurbishment assessment tool for buildings using high-end BIM data: Benefits and challenges

    Research output: Contribution to journalArticle in a proceedings journalScientific

    Abstract

    It is important to assess the effectiveness of different energy refurbishment scenarios in the early design stages of apartment buildings. This paper demonstrates the main features of a new tool BIMeaser (BIM Early Stage Energy Scenario - a product of the European Union Horizon 2020 project BIM4EEB), which supports the decision-making process in the early stage of design. The tool uses the BIM and linked data from the BIM Management System (BIMMS) for faster initialisation of the actual state, resulting in more accurate building models. The tool finds solutions in accordance with the client’s requirements while also aiming to minimize energy use and maximize the occupant’s indoor climate comfort.
    Original languageEnglish
    Article number28
    JournalProceedings
    Volume65
    Issue number1
    DOIs
    Publication statusPublished - 13 Jan 2021
    MoE publication typeB3 Non-refereed article in conference proceedings
    Event8th Annual International Sustainable Places Conference, SP 2020 - Digital Event
    Duration: 27 Oct 202030 Oct 2020
    http://www.sustainableplaces.eu
    https://www.sustainableplaces.eu/

    Keywords

    • apartment
    • renovation
    • energy performance
    • indoor climate
    • building information model
    • linked data
    • performance based design

    Fingerprint

    Dive into the research topics of 'Early stage energy refurbishment assessment tool for buildings using high-end BIM data: Benefits and challenges'. Together they form a unique fingerprint.

    Cite this