Abstract
Teollisuuden Voima Oy (TVO) owns and operates in Southern
Finland two BWR units (OL1 and OL2) and has one PWR unit
(OL3) under construction. The Finnish Regulatory Body
STUK requires that the design of new nuclear power plants
as well as the operation of the operating nuclear power
plants shall be supported by PSA. Recently, a project has
been carried out for the operating units OL1 and OL2, in
order to systematically evaluate the TechSpecs with PSA.
This study encompasses allowed outage times (AOTs) for
power operation, surveillance testing and, also, outages.
The paper discusses the insights and results of the
analyses. Examples of such insights are that there is no
single predominant methodology for this kind of
evaluation, and therefore AOT calculations may to be
studied from different aspects. Quantitative analysis
shall be supplemented with comprehensive qualitative
assessment with experts from plant organization prior to
final decision and proposal for changes in the TechSpecs.
A new area for application of the method are the
TechSpecs for shutdown states during the refueling
outage, for which the work is still ongoing.
| Original language | English |
|---|---|
| Title of host publication | PSA 2008, Challenges to PSA during the nuclear renaissance |
| Subtitle of host publication | International Topical Meeting on Probabilistic Safety Assessment & Analysis |
| Place of Publication | Knoxville |
| Publisher | American Nuclear Society (ANS) |
| Pages | 1606-1615 |
| ISBN (Print) | 978-0-89448-065-2 |
| Publication status | Published - 2008 |
| MoE publication type | A4 Article in a conference publication |
| Event | PSA 2008, Challenges to PSA during the nuclear renaissance. International Topical Meeting on Probabilistic Safety Assessment & Analysis - Knoxville, United States Duration: 7 Sept 2008 → 11 Sept 2008 |
Conference
| Conference | PSA 2008, Challenges to PSA during the nuclear renaissance. International Topical Meeting on Probabilistic Safety Assessment & Analysis |
|---|---|
| Country/Territory | United States |
| City | Knoxville |
| Period | 7/09/08 → 11/09/08 |
Keywords
- technical specifications
- PRA
- PSA
- risk-informed
- nuclear power plant
Fingerprint
Dive into the research topics of 'Evaluation of Olkiluoto BWR TechSpecs by using plant specific PSA'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver