Financial anatomy of E4 Helsinki-Lahti shadow toll PPP-project

Pekka Leviäkangas, Marcus Wigan, Harri Haapasalo

Research output: Contribution to journalArticleScientificpeer-review

5 Citations (Scopus)

Abstract

Purpose: The purpose of this paper is to investigate the returns to the investors and the state in private finance of road infrastructure. It uses an empirical case of the E4 Helsinki-Lahti road, which was built in 1995-1999 in Finland as the first real PPP-project. Design/methodology/approach: The analysis adopts an approach based on cash flow modelling of the project and the analyses show how the cash flows are formed and divided between the various stakeholders. The pure cash flow based approach to compare the economics of PPP vs traditional procurement of road infrastructure projects produced results that pose challenges to the logic, and pros and cons of shadow toll PPPs. Findings: The analysis shows that potential win-win situations are hard to find in shadow toll arrangements. This is largely due to the different discount rates used by investors and state. It is argued that the state does not include all the true costs in its appraisal of projects. Private investors, in principle and as a rule, price all of the relevant risks and uncertainties of which they are cognisant. Originality/value: The paper presents an analytical cash flow model that can be applied a wider range of PPP projects than simply to shadow toll roads. The paper contributes to the discussion on the viability of PPPs in different contexts.

Original languageEnglish
Pages (from-to)165-180
Number of pages16
JournalBuilt Environment Project and Asset Management
Volume3
Issue number2
DOIs
Publication statusPublished - Nov 2013
MoE publication typeNot Eligible

Fingerprint

Toll highways
Finance
Economics
Costs
Uncertainty
Cash flow
Roads

Keywords

  • Capital budgeting
  • Cash flow
  • Cost/benefit analysis
  • Investments
  • PPP
  • Private finance

Cite this

@article{e3d48bfe2449424fa3edc3b74624052e,
title = "Financial anatomy of E4 Helsinki-Lahti shadow toll PPP-project",
abstract = "Purpose: The purpose of this paper is to investigate the returns to the investors and the state in private finance of road infrastructure. It uses an empirical case of the E4 Helsinki-Lahti road, which was built in 1995-1999 in Finland as the first real PPP-project. Design/methodology/approach: The analysis adopts an approach based on cash flow modelling of the project and the analyses show how the cash flows are formed and divided between the various stakeholders. The pure cash flow based approach to compare the economics of PPP vs traditional procurement of road infrastructure projects produced results that pose challenges to the logic, and pros and cons of shadow toll PPPs. Findings: The analysis shows that potential win-win situations are hard to find in shadow toll arrangements. This is largely due to the different discount rates used by investors and state. It is argued that the state does not include all the true costs in its appraisal of projects. Private investors, in principle and as a rule, price all of the relevant risks and uncertainties of which they are cognisant. Originality/value: The paper presents an analytical cash flow model that can be applied a wider range of PPP projects than simply to shadow toll roads. The paper contributes to the discussion on the viability of PPPs in different contexts.",
keywords = "Capital budgeting, Cash flow, Cost/benefit analysis, Investments, PPP, Private finance",
author = "Pekka Levi{\"a}kangas and Marcus Wigan and Harri Haapasalo",
year = "2013",
month = "11",
doi = "10.1108/BEPAM-04-2012-0017",
language = "English",
volume = "3",
pages = "165--180",
journal = "Built Environment Project and Asset Management",
issn = "2044-124X",
publisher = "Emerald Publishing Limited",
number = "2",

}

Financial anatomy of E4 Helsinki-Lahti shadow toll PPP-project. / Leviäkangas, Pekka; Wigan, Marcus; Haapasalo, Harri.

In: Built Environment Project and Asset Management, Vol. 3, No. 2, 11.2013, p. 165-180.

Research output: Contribution to journalArticleScientificpeer-review

TY - JOUR

T1 - Financial anatomy of E4 Helsinki-Lahti shadow toll PPP-project

AU - Leviäkangas, Pekka

AU - Wigan, Marcus

AU - Haapasalo, Harri

PY - 2013/11

Y1 - 2013/11

N2 - Purpose: The purpose of this paper is to investigate the returns to the investors and the state in private finance of road infrastructure. It uses an empirical case of the E4 Helsinki-Lahti road, which was built in 1995-1999 in Finland as the first real PPP-project. Design/methodology/approach: The analysis adopts an approach based on cash flow modelling of the project and the analyses show how the cash flows are formed and divided between the various stakeholders. The pure cash flow based approach to compare the economics of PPP vs traditional procurement of road infrastructure projects produced results that pose challenges to the logic, and pros and cons of shadow toll PPPs. Findings: The analysis shows that potential win-win situations are hard to find in shadow toll arrangements. This is largely due to the different discount rates used by investors and state. It is argued that the state does not include all the true costs in its appraisal of projects. Private investors, in principle and as a rule, price all of the relevant risks and uncertainties of which they are cognisant. Originality/value: The paper presents an analytical cash flow model that can be applied a wider range of PPP projects than simply to shadow toll roads. The paper contributes to the discussion on the viability of PPPs in different contexts.

AB - Purpose: The purpose of this paper is to investigate the returns to the investors and the state in private finance of road infrastructure. It uses an empirical case of the E4 Helsinki-Lahti road, which was built in 1995-1999 in Finland as the first real PPP-project. Design/methodology/approach: The analysis adopts an approach based on cash flow modelling of the project and the analyses show how the cash flows are formed and divided between the various stakeholders. The pure cash flow based approach to compare the economics of PPP vs traditional procurement of road infrastructure projects produced results that pose challenges to the logic, and pros and cons of shadow toll PPPs. Findings: The analysis shows that potential win-win situations are hard to find in shadow toll arrangements. This is largely due to the different discount rates used by investors and state. It is argued that the state does not include all the true costs in its appraisal of projects. Private investors, in principle and as a rule, price all of the relevant risks and uncertainties of which they are cognisant. Originality/value: The paper presents an analytical cash flow model that can be applied a wider range of PPP projects than simply to shadow toll roads. The paper contributes to the discussion on the viability of PPPs in different contexts.

KW - Capital budgeting

KW - Cash flow

KW - Cost/benefit analysis

KW - Investments

KW - PPP

KW - Private finance

UR - http://www.scopus.com/inward/record.url?scp=84884768370&partnerID=8YFLogxK

U2 - 10.1108/BEPAM-04-2012-0017

DO - 10.1108/BEPAM-04-2012-0017

M3 - Article

VL - 3

SP - 165

EP - 180

JO - Built Environment Project and Asset Management

JF - Built Environment Project and Asset Management

SN - 2044-124X

IS - 2

ER -