Projects per year
Abstract
As the mean age of the existing fleet of currently operating European materials testing reactors approaches fifty years, the need for a new facility, to ensure continuity and provide the necessary support to the nuclear power plant community and nuclear industry becomes paramount. The Jules Horowitz Reactor, aims to fill this gap and respond to the ever-increasing industry needs. The Jules Horowitz Reactor is currently under construction at the CEA Cadarache research center and its first criticality should be reached during the mid-2020’s. In this paper, the JHR experimental capabilities at start-up along with the Finnish in-kind contributions to the JHR will be briefly described.
Original language | English |
---|---|
Title of host publication | SYP2019 Proceedings |
Subtitle of host publication | Nuclear Science and Technology Symposium - SYP2019 |
Publisher | Finnish Nuclear Society |
Publication status | Published - 2019 |
MoE publication type | B3 Non-refereed article in conference proceedings |
Event | Nuclear Science and Technology Symposium, NST 2019 - Helsinki, Finland Duration: 20 Oct 2019 → 31 Oct 2019 |
Conference
Conference | Nuclear Science and Technology Symposium, NST 2019 |
---|---|
Abbreviated title | NST 2019 |
Country/Territory | Finland |
City | Helsinki |
Period | 20/10/19 → 31/10/19 |
Fingerprint
Dive into the research topics of 'Jules Horowitz Reactor - the Future of European Materials Testing Reactors'. Together they form a unique fingerprint.Projects
- 1 Finished
-
JHR 2022: Participation in Jules Horowitz Reactor Project
Tulkki, V. (Manager), Moilanen, P. (Participant), Kinnunen, P. (Participant), Huotilainen, C. (Manager), Peltonen, J. (Participant) & Hytönen, N. (Participant)
1/01/19 → 31/12/22
Project: Other