N2 - During this project a new two-phase crushing line was
developed and built by Joutsan Konepalvelu Oy and VTT
Processes. In tests 1398 chip-m3 of wood fuel was made
from logging residues, demolition wood waste, forest
stumps, and arboricultural residues. Average production
capacity was from 40 to 100 chip-m3/h depending on
material and energy use 0,6-1,0 kWh/chip-m3 in crushers
and 0,9-1,8 kWh/chip-m3 in whole production line
including hydraulic feeding crane.
AB - During this project a new two-phase crushing line was
developed and built by Joutsan Konepalvelu Oy and VTT
Processes. In tests 1398 chip-m3 of wood fuel was made
from logging residues, demolition wood waste, forest
stumps, and arboricultural residues. Average production
capacity was from 40 to 100 chip-m3/h depending on
material and energy use 0,6-1,0 kWh/chip-m3 in crushers
and 0,9-1,8 kWh/chip-m3 in whole production line
including hydraulic feeding crane.
M3 - Conference article in proceedings
SN - 951-38-6287-9
T3 - VTT Symposium
SP - 95
EP - 104
BT - Puuenergian teknologiaohjelman vuosikirja 2003
PB - VTT Technical Research Centre of Finland
CY - Espoo
T2 - Puuenergian teknologiaohjelman vuosiseminaari
Y2 - 17 March 2004 through 18 March 2004
ER -