Small Modular Nuclear Reactor (SMR) technology is a new alternative for municipalities to produce carbon-neutral energy. Depending on the type of reactor and capacity, SMRs can be used for producing district heating, electricity or both. This often puts municipalities and municipal energy companies in a new situation – project development must take into account the requirements that regulate ordinary construction projects and also the requirements of the Nuclear Energy Act concerning site selection and licensing of a nuclear facility. The purpose of this guide is to give municipalities, municipal decision-makers and future project developers a better understanding of the entire life-cycle of SMR plant projects and what they should take into account as the project progresses. At the time of writing this guide, the Finnish Nuclear Energy Act and the Land Use Act have been reformed, and the information presented in the guide related to planning and licensing under the Nuclear Energy Act are based on the drafts of these laws. For this reason, up-to-date information and official instructions must always be verified directly from the responsible authorities. However, this guide can be used as preliminary information to support project preparation and decision-making.
The licensing process for projects under the Finnish Nuclear Energy Act progresses in phases, including the decision-in-principle for the nuclear facility, the construction license and the operating license. In addition, an SMR plant project requires an environmental impact assessment (EIA is a requirement for the construction license and the strategic environmental assessment (SEA) is part of the decision-in-principle) and other permits. A sufficiently large precautionary action zone, emergency planning zone, site-specific risks and other predetermined selection criteria, such as the distance to the electricity or district heating network, must be taken into account during site selection and planning related to each nuclear power plant. It is recommended that the surveying, comparison and final selection of suitable sites be carried out in stages. The license applicant’s responsibility is emphasised in terms of commissioning the necessary reports related to the project. Based on the reports, the Radiation and Nuclear Safety Authority (STUK) assesses whether the site meets the requirements set for it in the Nuclear Energy Act.
There are several possible organisational models for SMR plant projects. From the project aspect, important elements include the nuclear energy competence possessed by the project developer and especially the license applicant, a good safety culture, long-term commitment and sufficient financial resources. The license applicant may be a municipal energy company, a larger consortium or a national energy company/service provider. The nuclear power plant operator could also be a separate operator responsible for the safe use of the reactor. Owners can be a municipality, a joint municipal authority or an energy company. The supplier of the reactor is responsible for the reactor technology that they sell. The license applicant is also responsible for organising nuclear waste management and for the related costs. Nuclear waste management can be organised by the license applicant or, subject to certain conditions and commercial agreements, the waste management obligation can be transferred to another party. In particular, centralised waste management is recommended for spent nuclear fuel and high-level waste in order to ensure sufficient expertise and competence.
The use of nuclear power requires that the nuclear power plant has been designed to be safe, is safe to operate, and has effective plans for emergency situations. The use of nuclear power in municipalities must also be socially acceptable. This means that the license holder and the municipality both communicate about the preparation and progress of the project as openly and comprehensively as possible and ensure that residents have opportunities to participate, engage in dialogue and exert influence throughout the project preparation and the entire life cycle of the facility. In general, support for SMR is currently at a good level in Finland, and a resident survey indicates that the majority of city residents also have a positive attitude towards SMR. However, approval decreases when power plants are located in a person’s own municipality and especially in their immediate surroundings. Safety and nuclear waste management solutions often divide opinions, and people value open communication and opportunities to participate in decision-making.
In terms of nuclear waste management, additional communication and dialogue concerning the different options for organising waste management are needed.
The licensing process for projects under the Finnish Nuclear Energy Act progresses in phases, including the decision-in-principle for the nuclear facility, the construction license and the operating license. In addition, an SMR plant project requires an environmental impact assessment (EIA is a requirement for the construction license and the strategic environmental assessment (SEA) is part of the decision-in-principle) and other permits. A sufficiently large precautionary action zone, emergency planning zone, site-specific risks and other predetermined selection criteria, such as the distance to the electricity or district heating network, must be taken into account during site selection and planning related to each nuclear power plant. It is recommended that the surveying, comparison and final selection of suitable sites be carried out in stages. The license applicant’s responsibility is emphasised in terms of commissioning the necessary reports related to the project. Based on the reports, the Radiation and Nuclear Safety Authority (STUK) assesses whether the site meets the requirements set for it in the Nuclear Energy Act.
There are several possible organisational models for SMR plant projects. From the project aspect, important elements include the nuclear energy competence possessed by the project developer and especially the license applicant, a good safety culture, long-term commitment and sufficient financial resources. The license applicant may be a municipal energy company, a larger consortium or a national energy company/service provider. The nuclear power plant operator could also be a separate operator responsible for the safe use of the reactor. Owners can be a municipality, a joint municipal authority or an energy company. The supplier of the reactor is responsible for the reactor technology that they sell. The license applicant is also responsible for organising nuclear waste management and for the related costs. Nuclear waste management can be organised by the license applicant or, subject to certain conditions and commercial agreements, the waste management obligation can be transferred to another party. In particular, centralised waste management is recommended for spent nuclear fuel and high-level waste in order to ensure sufficient expertise and competence.
The use of nuclear power requires that the nuclear power plant has been designed to be safe, is safe to operate, and has effective plans for emergency situations. The use of nuclear power in municipalities must also be socially acceptable. This means that the license holder and the municipality both communicate about the preparation and progress of the project as openly and comprehensively as possible and ensure that residents have opportunities to participate, engage in dialogue and exert influence throughout the project preparation and the entire life cycle of the facility. In general, support for SMR is currently at a good level in Finland, and a resident survey indicates that the majority of city residents also have a positive attitude towards SMR. However, approval decreases when power plants are located in a person’s own municipality and especially in their immediate surroundings. Safety and nuclear waste management solutions often divide opinions, and people value open communication and opportunities to participate in decision-making.
In terms of nuclear waste management, additional communication and dialogue concerning the different options for organising waste management are needed.
| Original language | English |
|---|---|
| Place of Publication | Espoo |
| Publisher | VTT Technical Research Centre of Finland |
| Number of pages | 43 |
| Publication status | Published - 5 Oct 2026 |
| MoE publication type | D4 Published development or research report or study |
Publication series
| Series | VTT Research Report |
|---|---|
| Number | VTT-R-00072-26 EN |
Funding
SAFER2028
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
-
SDG 11 Sustainable Cities and Communities
-
SDG 12 Responsible Consumption and Production
-
SDG 14 Life Below Water
Keywords
- Small Modular Reactor (SMR)
- licensing
- planning
- decision-making
- engagement
Fingerprint
Dive into the research topics of 'Licensing and ensuring the safety of small modular reactors'. Together they form a unique fingerprint.Projects
- 1 Finished
-
SMRSiMa: SMR Siting and Waste Management
Naumer, S. (Manager), Keto, P. (Participant), Juutilainen, P. (Participant), Airola, M. (Participant), Gotcheva, N. (Participant), Schatz, T. (Participant), Rinta-Hiiro, V. (Participant), Tulkki, V. (Participant) & Häkkinen, S. (Participant)
1/04/23 → 31/01/26
Project: Research
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver