Skip to main navigation Skip to search Skip to main content

Main achievements of the EU HT test programme of ITER primary wall small scale mock ups

  • P. Lorenzetto*
  • , A. Cardella
  • , P. Chappuis
  • , W. Daenner
  • , A. Erskine
  • , M. Febvre
  • , G. Hofmann
  • , P. Le Gallo
  • , H. Stamm
  • , Seppo Tähtinen
  • *Corresponding author for this work
    • EFDA Close Support Unit Garching
    • Commissariat a l'Energie Atomique et aux Energies Alternatives (CEA)
    • NNC Ltd
    • Framatome GmbH
    • Forschungszentrum Karlsruhe (FZK)
    • EU-JRC Institute for Systems, Informatics and Safety (ISIS)

    Research output: Contribution to journal › Article › Scientific › peer-review

    Abstract

    This paper presents the main achievements of the European Home Team (EU HT) test programme of ITER primary wall small scale mock ups. It describes briefly the fabrication method of the mock ups, the test conditions and the main results obtained with high heat flux and thermal fatigue tests of Cu alloy/stainless steel and beryllium/Cu alloy/stainless steel mock ups. The results obtained so far show very good thermal fatigue performance and operation margin of the ITER primary first wall concept.

    Original languageEnglish
    Pages (from-to)263-268
    Number of pages6
    JournalFusion Engineering and Design
    Volume49-50
    DOIs
    Publication statusPublished - 2000
    MoE publication typeA1 Journal article-refereed

    UN SDGs

    This output contributes to the following UN Sustainable Development Goals (SDGs)

    1. SDG 7 - Affordable and Clean Energy
      SDG 7 Affordable and Clean Energy

    Fingerprint

    Dive into the research topics of 'Main achievements of the EU HT test programme of ITER primary wall small scale mock ups'. Together they form a unique fingerprint.

    Cite this