Nordic Pilot Studies on Site Risk Analysis (SITRON project): Risk metrics developments

Jan-Erik Holmberg, Cilla Andersson, Stefan Authen, Ola Bäckström, Xuhong He, Per Hellström, Anders Karlsson, Tero Tyrväinen

    Research output: Contribution to conferenceConference articleScientific

    Abstract

    The Swedish nuclear utilities Forsmark Kraftgrupp and Ringhals AB and the Swedish Radiation Safety Authority are financing together with the Finnish Nuclear Safety Research Programme SAFIR2018 a project, called SITRON (site risk of nuclear installations). The objective with SITRON is to develop methods and requirements for a nuclear power plant site risk analysis, driven by a performance of two pilot studies: one regarding the units 1 and 2 at Forsmark nuclear power plant site and the other one regarding units 3 and 4 at the Ringhals nuclear power plant site. This paper provides a summary of the SITRON project and discusses the development of risk metrics for the site risk analysis purposes. Risk metrics have been defined both for Level 1 and 2 PSA and use of them have been tested in pilot studies.
    Original languageEnglish
    Number of pages13
    Publication statusPublished - Jul 2018
    MoE publication typeNot Eligible
    EventInternational Workshop on Status of Site Level PSA (including Multi-unit PSA) Developments - Maritim Hotel, Munich, Germany
    Duration: 18 Jul 201820 Jul 2018

    Workshop

    WorkshopInternational Workshop on Status of Site Level PSA (including Multi-unit PSA) Developments
    Country/TerritoryGermany
    CityMunich
    Period18/07/1820/07/18

    Keywords

    • site probabilistic safety assessment
    • multi-unit probabilistic risk assessment