Abstract
The Swedish nuclear utilities Forsmark Kraftgrupp and Ringhals AB and the Swedish Radiation Safety Authority are financing together with the Finnish Nuclear Safety Research Programme SAFIR2018 a project, called SITRON (site risk of nuclear installations). The objective with SITRON is to develop methods and requirements for a nuclear power plant site risk analysis, driven by a performance of two pilot studies: one regarding the units 1 and 2 at Forsmark nuclear power plant site and the other one regarding units 3 and 4 at the Ringhals nuclear power plant site. This paper provides a summary of the SITRON project and discusses the development of risk metrics for the site risk analysis purposes. Risk metrics have been defined both for Level 1 and 2 PSA and use of them have been tested in pilot studies.
| Original language | English |
|---|---|
| Number of pages | 13 |
| Publication status | Published - Jul 2018 |
| MoE publication type | Not Eligible |
| Event | International Workshop on Status of Site Level PSA (including Multi-unit PSA) Developments - Maritim Hotel, Munich, Germany Duration: 18 Jul 2018 → 20 Jul 2018 |
Workshop
| Workshop | International Workshop on Status of Site Level PSA (including Multi-unit PSA) Developments |
|---|---|
| Country/Territory | Germany |
| City | Munich |
| Period | 18/07/18 → 20/07/18 |
Keywords
- site probabilistic safety assessment
- multi-unit probabilistic risk assessment
Fingerprint
Dive into the research topics of 'Nordic Pilot Studies on Site Risk Analysis (SITRON project): Risk metrics developments'. Together they form a unique fingerprint.Cite this