The use of risk informed methods in daily operation at nuclear power
plants as well as for long term evaluation and definition of rules and
regulations is increasing. Risk informed methods have been applied on a case
by case basis during the past few years, but it is expected that these methods
will be applied in a quite different manner in the coming years. The report
summarises a literature study and interviews with persons at the Swedish and
Finnish utilities and authorities on risk-informed approaches to evaluate
Technical Specifications (TS) at nuclear power plants. A short background to
the current TS is also given and the role of PSA in the TS evaluation process
is briefly discussed. Methods, discussions and comments with regard to
surveillance test interval and allowed outage time analyses respectively are
presented.
| Original language | English |
|---|
| Place of Publication | Roskilde |
|---|
| Publisher | Nordic Nuclear Safety Research NKS |
|---|
| Number of pages | 36 |
|---|
| ISBN (Print) | 978-87-7893-237-2 |
|---|
| Publication status | Published - 2008 |
|---|
| MoE publication type | D4 Published development or research report or study |
|---|
| Series | NKS Reports |
|---|
| Volume | 171 |
|---|