Abstract
This deliverable collects the main results obtained from evaluations of the piloted safety measures selected in earlier phases of the SAFER-LC project. This deliverable reports the descriptions of the piloted measures at railway level crossings, method and data to evaluate the safety effects of the selected measures, as well as the results of evaluations together with their discussion.
| Original language | English |
|---|---|
| Publisher | SAFER-LC Project |
| Number of pages | 163 |
| Publication status | Published - 31 Dec 2019 |
| MoE publication type | D4 Published development or research report or study |
Keywords
- safety
- level crossing
- assessment
- piloting
Fingerprint
Dive into the research topics of 'Results of the evaluation of the pilot tests: SAFER-LC project Deliverable D4.4'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver