Abstract
Purpose – Hospital construction projects often suffer from relatively late changes in the project lifecycle, which disrupt the project execution and impact project productivity. This paper explores the root causes of changes in hospital construction projects. The paper aims to propose ways to prepare for the changes.Design/methodology/approach – The study focuses on changes during the construction of new hospital facilities. An explorative, case study research design is utilised. Five case projects from Finland, Sweden, and the USA were selected for in-depth analysis. The primary data comprises semi-structured interviews, supported by secondary evidence such as change order documents.Findings – The findings reveal eight categories for change sources: Contracts, and Equipment and systems are reflective of the fast-paced healthcare technology and changing user requirements, while External environment comprises changes caused by both regulatory and physical environment. Changes in Operations are reflected in the continuous development of treatment methods and processes. The User, Owner, Designer, and Contractor initiated changes represent the stakeholder influence. The paper makes a connection between these change sources and project complexity dimension. A framework for change dynamics is introduced, and product and process flexibility is suggested as a suitable method to prepare for and manage changes.Originality/value – The paper is the first to link construction changes to project complexity factors. The paper argues that changes, when managed appropriately, are not only necessary but also beneficial to large construction projects in a quickly changing environment. The findings guide project stakeholders in implementing project flexibility, in the product and process dimensions, which is a balancing force to project complexity.Keywords Project management, Construction, Case StudyPaper type Research paper
Original language | English |
---|---|
Pages (from-to) | 1946-1961 |
Number of pages | 16 |
Journal | Engineering, Construction and Architectural Management |
Volume | 26 |
Issue number | 9 |
DOIs | |
Publication status | Published - 1 May 2019 |
MoE publication type | A1 Journal article-refereed |
Keywords
- Case study
- Construction
- Project management