Abstract
In Finland, buildings are commissioned mostly in the end of the construction phase. However, the commissioning of building performance is a systematic process which should kick off
already at the pre-design phase and it should be continued through design, construction and acception to occupancy, use, operation and maintenance. During the Cx process, it should be
checked that owner’s and users’ needs and requirements are clearly defined and documented, and indoor and energy performance requirements are included to owner’s program. In
addition, it should be audited that the design solutions and installation outputs meet given requirements, and verified that the building satisfies given indoor and energy requirements in
use. Commissioning should also be included as an essential part of a systematic facility management process over the building life cycle.
This paper describes a systematic process for commissioning building energy performance and indoor conditions. The Cx process is developed to be applied in Finland. In addition,
checklists for each commissioning phase for a commissioning manager were developed. Also preparation of a Cx plan, and options for a Cx team and examples of task responsibilities are
briefly discussed.
already at the pre-design phase and it should be continued through design, construction and acception to occupancy, use, operation and maintenance. During the Cx process, it should be
checked that owner’s and users’ needs and requirements are clearly defined and documented, and indoor and energy performance requirements are included to owner’s program. In
addition, it should be audited that the design solutions and installation outputs meet given requirements, and verified that the building satisfies given indoor and energy requirements in
use. Commissioning should also be included as an essential part of a systematic facility management process over the building life cycle.
This paper describes a systematic process for commissioning building energy performance and indoor conditions. The Cx process is developed to be applied in Finland. In addition,
checklists for each commissioning phase for a commissioning manager were developed. Also preparation of a Cx plan, and options for a Cx team and examples of task responsibilities are
briefly discussed.
| Original language | English |
|---|---|
| Title of host publication | Proceedings Clima 2007 WellBeing Indoors |
| Editors | Olli Seppänen, Jorma Säteri |
| Place of Publication | Helsinki |
| Pages | 471-476 |
| Volume | 5 |
| ISBN (Electronic) | 978-952-99898-3-6 |
| Publication status | Published - 2007 |
| MoE publication type | A4 Article in a conference publication |
| Event | 9th Rehva World Congress, Clima 2007 - WellBeing Indoors - Helsinki, Finland Duration: 10 Jun 2007 → 14 Jun 2007 Conference number: 9 |
Conference
| Conference | 9th Rehva World Congress, Clima 2007 - WellBeing Indoors |
|---|---|
| Abbreviated title | CLIMA 2007 |
| Country/Territory | Finland |
| City | Helsinki |
| Period | 10/06/07 → 14/06/07 |
Fingerprint
Dive into the research topics of 'Systematic process for commissioning building energy performance and indoor conditions'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver