Abstract
The commissioning of building performance is a systematic
process which should start already at the pre-design
phase and it should be continued through the design,
construction and implementation phases into the actual
use, operation and maintenance of the building. During
the so-called Farm-Cx process, it should be checked that
the needs and requirements of the owners and users are
clearly documented and the indoor and energy performance
requirements are really included in the owner's program.
In addition, the process should be audited to make sure
that the design solutions and installation outputs meet
the given requirements. Finally, it should be verified by
measurements that the farm building satisfies the
prescribed indoor and energy requirements in use.
Original language | English |
---|---|
Publication status | Published - 2008 |
MoE publication type | Not Eligible |
Event | International Conference on Agricultural Engineering - Hersonissos, Greece Duration: 23 Jun 2008 → 25 Jun 2008 |
Conference
Conference | International Conference on Agricultural Engineering |
---|---|
Country/Territory | Greece |
City | Hersonissos |
Period | 23/06/08 → 25/06/08 |
Keywords
- commissioning
- farm building
- indoor air quality
- energy efficiency