Abstract
Continuous improvement requires visualizing process constraints which interrupt workflows. Production control from a management perspective often operates at lower levels of information granularity than required at operational levels to perform work without interruptions. If not controlled in detail, causes and effects of workflow interruptions remain unclear in environments of high complexity and non-standardized work. Workflow efficiency has been studied through work sampling or time-motion studies, estimating shares of direct work. However, few studies exist that show how to create digital representations of workflows and analyse them for interruptions, contributing to smoother workflows. The paper examines workflows of plumbing work from video footage. This video data is classified and analysed for frequency, causes, and effects of work interruptions. Results indicate that value-supporting activities caused the largest proportion of interruptions. Moreover, the proportion of non-value-adding activities increases when durations of interruptions rise. Based on the results, the paper contributes to further understanding of workflow interruptions in plumbing work. Finally, it provides suggestions on how to close gaps of information granularity between management and operational levels, through the development of simulation models and the application of automated data collection, contributing to developing digital twins of construction processes.
| Original language | English |
|---|---|
| Title of host publication | Proceedings of the 30th Annual Conference of the International Group for Lean Construction (IGLC30) |
| Publisher | IGLC |
| Pages | 142-152 |
| Number of pages | 11 |
| DOIs | |
| Publication status | Published - 2022 |
| MoE publication type | A4 Article in a conference publication |
| Event | 30th Annual Conference of the International Group for Lean Construction, IGLC 2022 - Edmonton, Canada Duration: 25 Jul 2022 → 31 Jul 2022 |
Conference
| Conference | 30th Annual Conference of the International Group for Lean Construction, IGLC 2022 |
|---|---|
| Country/Territory | Canada |
| City | Edmonton |
| Period | 25/07/22 → 31/07/22 |
Funding
This work has been supported by Hukka LVI- ja sähkötöissä (Waste in plumbing and electrical work) project funded by STUL (eletrical contractor assocation), LVI-TU (HVAC contractor association) and STTA (electrical employers union) from Finland. This work has been supported by Hukka LVI-ja sähkötöissä (Waste in plumbing and electrical work) project funded by STUL (eletrical contractor assocation), LVI-TU (HVAC contractor association) and STTA (electrical employers union) from Finland.
Keywords
- continuous improvement/kaizen
- job-sequencing
- production control
- time-motion study
- workflow