Variability of targets for component qualifications with structural response

Vilho Jussila, Ludovic Fülöp

Research output: Book/ReportReportProfessional

Abstract

This report is deliverable for 2013 of Subproject 3 in the project SESA "Seismic Safety of Nuclear Power Plants - Targets for Research and Education", part of the SAFIR 2014 program on nuclear safety. In 2013, in Subproject 3, the review task for an emergency diesel generator day-tank has been started according to the discussions in the Ad-Hoc group of SESA. The day-tank has been one configuration supplied by Wärtsilä, and loads were provided by TVO according to a realistic scenario for placement of the day-tank. The aim was to carry out modeling of the day-tank, starting with simple models and ending with very sophisticated liquid interaction models, in order to understand the limitations of the analysis methods usually used in the qualification process. In this stage loads were predefined for the day-tank scenario, but in the next stage some variability of the loading will also be considered. The main emphasis of Subproject 3 is in 2014 according to the multi-annual plan of the SESA project.
Original languageEnglish
PublisherVTT Technical Research Centre of Finland
Number of pages17
Publication statusPublished - 2014
MoE publication typeD4 Published development or research report or study

Publication series

NameVTT Research Report
PublisherVTT
VolumeVTT-R-00652-14

Fingerprint

Nuclear power plants
Education
Liquids

Keywords

  • Nuclear Power Plants
  • Seismic Safety
  • Design

Cite this

Jussila, V., & Fülöp, L. (2014). Variability of targets for component qualifications with structural response. VTT Technical Research Centre of Finland. VTT Research Report, Vol.. VTT-R-00652-14
Jussila, Vilho ; Fülöp, Ludovic. / Variability of targets for component qualifications with structural response. VTT Technical Research Centre of Finland, 2014. 17 p. (VTT Research Report, Vol. VTT-R-00652-14).
@book{66f9827dd55a4e81ae706b39e4af5d39,
title = "Variability of targets for component qualifications with structural response",
abstract = "This report is deliverable for 2013 of Subproject 3 in the project SESA {"}Seismic Safety of Nuclear Power Plants - Targets for Research and Education{"}, part of the SAFIR 2014 program on nuclear safety. In 2013, in Subproject 3, the review task for an emergency diesel generator day-tank has been started according to the discussions in the Ad-Hoc group of SESA. The day-tank has been one configuration supplied by W{\"a}rtsil{\"a}, and loads were provided by TVO according to a realistic scenario for placement of the day-tank. The aim was to carry out modeling of the day-tank, starting with simple models and ending with very sophisticated liquid interaction models, in order to understand the limitations of the analysis methods usually used in the qualification process. In this stage loads were predefined for the day-tank scenario, but in the next stage some variability of the loading will also be considered. The main emphasis of Subproject 3 is in 2014 according to the multi-annual plan of the SESA project.",
keywords = "Nuclear Power Plants, Seismic Safety, Design",
author = "Vilho Jussila and Ludovic F{\"u}l{\"o}p",
note = "Project code: 73688 .",
year = "2014",
language = "English",
series = "VTT Research Report",
publisher = "VTT Technical Research Centre of Finland",
address = "Finland",

}

Jussila, V & Fülöp, L 2014, Variability of targets for component qualifications with structural response. VTT Research Report, vol. VTT-R-00652-14, VTT Technical Research Centre of Finland.

Variability of targets for component qualifications with structural response. / Jussila, Vilho; Fülöp, Ludovic.

VTT Technical Research Centre of Finland, 2014. 17 p. (VTT Research Report, Vol. VTT-R-00652-14).

Research output: Book/ReportReportProfessional

TY - BOOK

T1 - Variability of targets for component qualifications with structural response

AU - Jussila, Vilho

AU - Fülöp, Ludovic

N1 - Project code: 73688 .

PY - 2014

Y1 - 2014

N2 - This report is deliverable for 2013 of Subproject 3 in the project SESA "Seismic Safety of Nuclear Power Plants - Targets for Research and Education", part of the SAFIR 2014 program on nuclear safety. In 2013, in Subproject 3, the review task for an emergency diesel generator day-tank has been started according to the discussions in the Ad-Hoc group of SESA. The day-tank has been one configuration supplied by Wärtsilä, and loads were provided by TVO according to a realistic scenario for placement of the day-tank. The aim was to carry out modeling of the day-tank, starting with simple models and ending with very sophisticated liquid interaction models, in order to understand the limitations of the analysis methods usually used in the qualification process. In this stage loads were predefined for the day-tank scenario, but in the next stage some variability of the loading will also be considered. The main emphasis of Subproject 3 is in 2014 according to the multi-annual plan of the SESA project.

AB - This report is deliverable for 2013 of Subproject 3 in the project SESA "Seismic Safety of Nuclear Power Plants - Targets for Research and Education", part of the SAFIR 2014 program on nuclear safety. In 2013, in Subproject 3, the review task for an emergency diesel generator day-tank has been started according to the discussions in the Ad-Hoc group of SESA. The day-tank has been one configuration supplied by Wärtsilä, and loads were provided by TVO according to a realistic scenario for placement of the day-tank. The aim was to carry out modeling of the day-tank, starting with simple models and ending with very sophisticated liquid interaction models, in order to understand the limitations of the analysis methods usually used in the qualification process. In this stage loads were predefined for the day-tank scenario, but in the next stage some variability of the loading will also be considered. The main emphasis of Subproject 3 is in 2014 according to the multi-annual plan of the SESA project.

KW - Nuclear Power Plants

KW - Seismic Safety

KW - Design

M3 - Report

T3 - VTT Research Report

BT - Variability of targets for component qualifications with structural response

PB - VTT Technical Research Centre of Finland

ER -

Jussila V, Fülöp L. Variability of targets for component qualifications with structural response. VTT Technical Research Centre of Finland, 2014. 17 p. (VTT Research Report, Vol. VTT-R-00652-14).